How long will it take?

Bishop Doyle at Holy Comforter Episcopal Church Dedication

Bishop Doyle at Holy Comforter Episcopal Church Dedication

 

Below is a typical timeline for most projects:

  1. Master Planning (optional)………………3-4 mo.
  2. Fundraising ………………………………………4 mo.
    ( Often Conducted During Architectural Services )
  3. Architectural Services
    • Design & Documentation ………….8-12 mo.
    • Bidding & Permitting…………………..2-3 mo.
    • Construction…………………………….9-12 mo.

The time required is contingent upon the scope of the project and the availability of the team to meet.

 